The weather has been kind again this week and we are now at the point where the entire scaffolding is up, lintels have been installed and both the brick and interior block walls are finished up to roof height.
In addition, the internal block walls have been completed. We have decided to reinstate the original front door (at the Church Street end of the building), but this door will now open into a small lobby for coats etc, with another door into the main part of the Hall. If we have to continue with social distancing, this will also help to provide a one-way system with exit at the far end of the building.
Nest week, we hope to start with the roof!