This week has seen a lot of activity indoors and most of the work is now complete.
The electrical switches, sockets, lights and emergency lights have gone in. There is a little more to do in the accessible WC, and then the power can be restored to the building.
The radiators have been installed and tested, and the plumbing to the accessible WC is complete except for the water heater.
The emergency door arrived and has been fitted.
The internal doors and architraves have been installed and painted.
But most importantly; the main Hall floor has been laid with just the skirtings left to fit. It feels amazing to walk on, and it looks great!